hirst electrical
 HOME  ABOUT US  NEWS  VACANCIES  CONTACT
   HIGH VOLTAGE
   LOW VOLTAGE
   WELDING TO ASME IX
   GENERATOR MECHANICAL SERVICES
   HV & LV CABLE HIRE
   TRANSFORMER HIRE
   HV SWITCHGEAR HIRE
   CONTRACT LIFTING
   LANDFILL WASTE TO ENERGY
   GENERATOR ELECTRICAL SERVICES
   GAS TESTING FACILITY
   COMBINED HEAT & POWER
   CONTAINERISED PACKAGE
SUB-STATIONS
   TESTING AND COMMISSIONING
   THERMOGRAPHIC INSPECTIONS
   EARTHING DESIGN
   PROTECTION STUDIES
   SITE REMOVALS
 

Specialist Services // Gas Testing Facility

Hirst Electrical recently installed a Gas supply and Booster with a capacity of 5MW at their Wakefield Works.

Initially this was used to Commission Generators that Hirst Electrical had previously built. However the facility has proved to be a great success with External Customers.

Hirst Electrical offer the following:

  • Test Pad  Area  20mts  x 10mts
  • Gas Capacity to 5MW
  • Gas Booster
  • Low Voltage Distribution System for Auxillary Equipment
  • Lifting Facilities
  • Resistive Reactive Loadbanks
  • Bunded Tanks for Oil and Glycol
  • Commissioning Engineer

The most recent test was a 2MW Bi-Fuel Diesel  running in parralell with a 1.4MW Gas Engine . This package was built, tested and then shipped to a site Nr Cairo in Egypt. The units were installed and commissioned on site  through Hirst Electrical's Electrical and Mechanical Division.

 
gas testing facility 1
 
gas testing facility 2
 
gas testing facility 3

© HIRST ELECTRICAL PLANT HIRE SERVICES (UK) LTD POD9 ECOMMERCE LEEDS